Act 16 in Bulgaria: the permit to use a building

In Bulgaria a building is not finished when the concrete is done. Its fitness to be handed over and used is certified through a numbered series of acts, and the document commonly called Act 16 sits at the end of that chain: it means the building may lawfully be used. The most common mistake foreign buyers make with new construction is signing without knowing which link of the chain the building has reached.

Real estate · Last reviewed: 2026-08-23

Why the acts are numbered

Bulgarian planning law does not reduce construction to a single moment of completion. The structural shell, the installations, the handover and the fitness for use are certified separately, and each act binds different parties — some sit between contractor and developer, others belong to administrative supervision. That is why a seller saying the paperwork is in order proves nothing; the question is which document exists.

Act 15 and Act 16 are different things

Listings call both of them an act; for a buyer the difference is decisive.
Act 15Act 16 / permit to use
What it certifiesThat the building can be accepted by the developerThat the building is fit to be used
Between whomContractor, developer and supervisionAdministration and the owner of the works
ConsequenceHandover and usually a payment instalmentLawful use and utility accounts
For the buyerThe building may look ready while the procedure is notThe building may lawfully be occupied

Who issues the permit

  • Competence follows the category of the works: for some buildings it lies with national construction supervision, for others with the municipality.
  • The category depends on the type and scale of the works, so a residential block, a small extension and an infrastructure facility do not follow the same route.
  • Cadastral recording runs in parallel: until the building and the individual units appear in the cadastral map, the file remains incomplete.
  • Electricity, water and gas providers ask for the permit to use; without it permanent accounts are usually not opened.

The order of checks for new build

  1. Ask in writing which stage the works have reached

    Instead of a verbal assurance, request which acts have been drawn up and on what dates. The stage also drives the payment schedule in your contract.
  2. Check the cadastre

    Use the services of the cadastre agency to see whether the building and your specific unit are recorded. If they are not, ask the seller why.
  3. Put the obligation in the contract

    Where the sale precedes the permit, the duty to obtain it and the consequences of delay belong in the contract in express terms.
  4. Leave utilities and address registration until last

    Before the procedure closes, accounts and address registration tend to stall; waiting costs less than forcing the sequence.

No deadlines or fees are quoted here

The procedure, the required documents and the fees depend on the category of the works and on the municipality, and the rules change. The binding information is published by the Ministry of Regional Development, the relevant municipality and egov.bg. Consult a property lawyer before signing.

This is not legal or financial advice

This page explains the process in general terms and points to the official sources of the competent authorities. For decisions specific to your own situation, consult a lawyer, an accountant or the relevant institution. Rules and amounts change over time.

Frequently asked questions

Can I move into a flat without a permit to use?

The property is not treated as lawfully usable, and utility accounts and address registration stall. Physically moving in does not cure the missing procedure.

How do I verify a claim that Act 16 has been issued?

Ask for the document itself with its date and check the cadastral record of the building. Verifying against a document prevents most later disputes.

Is buying off-plan prohibited?

No, but the allocation of risk differs. In such deals the payment schedule, the handover and the duty to obtain the permit should be spelled out in the contract.

Sources

The information on this page is based on the official sources listed below. Legislation changes — open the links and verify the current position.

  1. Министерство на регионалното развитие и благоустройството (МРРБ)https://www.mrrb.government.bg/ · 2026-08-23
  2. Закон за устройство на територията — lex.bghttps://lex.bg/ · 2026-08-23
  3. Агенция по геодезия, картография и кадастър (АГКК)https://www.cadastre.bg/ · 2026-08-23
  4. Столична община — административни услугиhttps://www.sofia.bg/ · 2026-08-23
  5. Единен портал за електронни административни услуги (egov.bg)https://egov.bg/ · 2026-08-23

Related topics

Real estate

Buying property in Bulgaria: process and checks

The route to the notarial deed, property and cadastre checks, why a preliminary contract is not ownership, and which cost items arise on transfer.

Real estate

Transferring title in Bulgaria: deed and registration

How the notarial procedure works, why registration is a separate step, the risks of acting by power of attorney, and what remains to be done afterwards.

Real estate

Cadastre and property register: two separate systems

How the cadastre differs from the property register, which document proves what, and the searches to run before buying a Bulgarian property.

Real estate

Preliminary sale contract for Bulgarian property

A preliminary contract does not transfer ownership; it creates an obligation to complete the sale. What it must contain and what happens if a party walks away.

Act 16 in Bulgaria: the permit to use a building | Bulgaristan.bg